Trim work lives in the gaps between trades: long runs installed, then caulked, then painted, and when the sequence with the paint crew slips, the room stalls and nobody can say who's waiting on whom.
Scaftra scopes trim per room, schedules the crew onto the job, and evidences every run with proof and daily logs, so the install-caulk-paint handoff is visible instead of guessed.
Start free→Trim is long continuous runs: base, casing, crown: and it's rarely a standalone trade: it installs, gets caulked, and gets painted, often by different crews across multiple visits. When that room-level sequence isn't tracked, the paint crew shows up to un-caulked trim, or the punch walk finds gaps nobody logged.
Trim quality is judged at the joints, and the joints depend on the handoff to paint. A room that's trimmed but not ready for paint is a stalled room, and a stalled room nobody flagged is a slipped schedule. Room-level proof and scheduling are where that coordination lives.
Scaftra runs trim as a room-scoped trade on the same execution spine as every finish trade. Only the rooms that get trim carry it; scheduling a crew onto the job is what puts them on the project; install progress is captured as photo proof and daily logs room by room; homeowner choices ride Selections that gate the room until approved; and completed work advances the room's install phase, which drives earned value and billing. Because trim hands off to paint in the same room, the per-room install record and schedule make the install-caulk-paint sequence visible.
Bring one project onto Scaftra. We'll set up your trades, your rooms, your proof chain, and your vendor portal, and connect it to the financial system you already run.