Trim & Millwork Software for Finish Contractors

Trim work lives in the gaps between trades: long runs installed, then caulked, then painted, and when the sequence with the paint crew slips, the room stalls and nobody can say who's waiting on whom.

Scaftra scopes trim per room, schedules the crew onto the job, and evidences every run with proof and daily logs, so the install-caulk-paint handoff is visible instead of guessed.

Start free→

The problem

Trim is long continuous runs: base, casing, crown: and it's rarely a standalone trade: it installs, gets caulked, and gets painted, often by different crews across multiple visits. When that room-level sequence isn't tracked, the paint crew shows up to un-caulked trim, or the punch walk finds gaps nobody logged.

Why it matters

Trim quality is judged at the joints, and the joints depend on the handoff to paint. A room that's trimmed but not ready for paint is a stalled room, and a stalled room nobody flagged is a slipped schedule. Room-level proof and scheduling are where that coordination lives.

Common mistakes

Try
Treating trim as one job-level task
Reality
A whole-house trim status hides which rooms are run, which are caulked, and which are ready for paint. Trim is a per-room handoff.
Try
Losing the paint handoff
Reality
Marking trim 'done' without flagging the room ready for caulk and paint leaves the next crew guessing.
Try
No proof on the joints
Reality
Trim disputes are about gaps and miters. No room photo means the argument is verbal.

The recommended workflow

  1. Scope trim per room
    Set which rooms get trim so scope and progress are tracked where the work happens.
  2. Schedule the crew
    Put the trim crew on the room's schedule, that's what assigns them and sets the sequence with paint.
  3. Install and proof each run
    Capture photo proof of the runs and joints room by room as the CYA record.
  4. Hand off to caulk and paint
    Advance the room so the paint crew knows it's ready; the daily log carries the state.
  5. Close the room
    Walk the punch on the joints and close; progress rolls up to the job and billing.

How Scaftra solves this

Scaftra runs trim as a room-scoped trade on the same execution spine as every finish trade. Only the rooms that get trim carry it; scheduling a crew onto the job is what puts them on the project; install progress is captured as photo proof and daily logs room by room; homeowner choices ride Selections that gate the room until approved; and completed work advances the room's install phase, which drives earned value and billing. Because trim hands off to paint in the same room, the per-room install record and schedule make the install-caulk-paint sequence visible.

  • Per-room runs
    Track base, casing, and crown progress per room.
  • Paint coordination
    Scheduling makes the install-caulk-paint handoff visible.
  • Joint proof
    Photo proof of joints and miters as the CYA record.

Key features

  • Per-room trade scoping: Only the rooms that actually get trim carry it, scope is set per room, not per job.
  • Scheduling that builds the crew: Putting a crew on the schedule is the act that assigns them to the project, no separate roster step.
  • Install proof + daily logs: Photo proof and daily logs evidence the work room by room, the record that settles a dispute.
  • Homeowner sign-off via Selections: Finish and product choices are captured as Selections that block the room until the homeowner approves.
  • Progress drives billing: Completed install advances the room's phase, which the financial spine reads for earned value and billing.

On the roadmapComing soon

  • Trim takeoff & material tracking: Run-length takeoff and material ordering so long trim runs are quantified and tracked like the custom-fabricated trades.

Benefits

  • Every room that gets trim is scoped, scheduled, and tracked, no whole-house guesswork.
  • Photo proof and daily logs make the work defensible when a dispute lands.
  • Homeowner choices are approved up front, so remakes don't trace to a verbal yes.
  • Completed work rolls up to earned value and billing automatically.

Who this is for

1–3 installer shops4–10 crew shops11+ crew operations
  • 1–3 installer shops.Owner-run trim crews who need per-room scope and proof without a back office.
  • 4–10 crew shops.Growing trim contractors where per-room tracking prevents missed work and slipped dates.
  • 11+ crew operations.High-volume trim operations needing room-level visibility across many jobs at once.

Frequently asked questions

Does Scaftra track trim per room?
Yes. Trim is a room-scoped trade, scope and install progress are tracked per room, not as one job-level status.
How does it handle the handoff to paint?
Scheduling and the per-room install record make the install-caulk-paint sequence visible, so the paint crew knows when a room is ready.
Is there a dedicated trim ordering workflow?
No: trim rides the general execution surfaces (scope, schedule, proof, billing). The measure-and-order-to-the-shop workflow is specific to cabinets and countertops.
How are disputes about joints handled?
Photo proof and daily logs evidence the runs and joints room by room, so the record settles it instead of a verbal argument.
Is this only for trim?
Scaftra covers all finish trades: cabinets, countertops, trim, paint, tile, flooring, glass, doors and hardware, closets.

One job. One record. From the field to the books.

Bring one project onto Scaftra. We'll set up your trades, your rooms, your proof chain, and your vendor portal, and connect it to the financial system you already run.