NEW 21-day free trial · onboard your first project in a day · cancel anytime Start free
Scaftra · noun · /skaf-truh/
Proof.
Not
Promises.
Operating doctrine, since day one
If it isn't proven, it isn't done.

Trade execution
from design through
proof-backed completion.

Buildertrend organizes projects. ServiceTitan runs service trades. Procore governs commercial construction. Acumatica runs accounting. Scaftra runs the work itself. Room-by-room, trade-by-trade, with proof.

Built by trade contractors · 1,800+ installs run on Scaftra
Live · Kitchen install · A-103
Field mode · Level 1 floor plan with blocking issues
Project roll-up · 42% complete across 3 buildings
Etymology /skaf-truh/ · noun · coined 2025
SCAlable For TRAdes
SCAFTRA
Construction operations software that doesn't fight you.
A category of one · alongside
Buildertrend
ServiceTitan
Procore
Acumatica
BuildOps
JobTread
Positioning

Most platforms optimize for one job. We optimize for execution.

Trade contractors don't need another tab on top of QuickBooks. They need one platform that runs the work, from drawing markup to install proof to retainage release.

Buildertrend
organizes builder & client projects.
ServiceTitan
runs service dispatch & FSM for trades.
Procore
governs commercial construction projects.
Acumatica
runs accounting and back-office operations.
Fieldwire
coordinates field markup & sheets.
Scaftra
runs trade execution from design through proof-backed completion.
The unifier

Eight layers other tools split across vendors. One operating spine.

The combination is still uncommon in the market. Trade-first execution requires all eight working off the same room, the same scope, the same chain of evidence.

01

Trade-first execution

Cabinets, tops, trim, paint, flooring, tile, glass. Each trade is a first-class scope, not a checkbox on a task.

02

Room-centric workflows

Kitchen, Bath, Laundry. The work happens in rooms; the system models them and tracks every spec inside them.

03

Install orchestration

Measure, fabricate, deliver, install, punch. One pipeline, not five spreadsheets.

04

Proof / CYA systems

Every step backed by photos, sign-offs, and timestamps. "It was done" is provable, not a story.

05

Field accountability

Structured punch with assignees, due dates, proof requirements. No "I'll get to it."

06

Designer to field continuity

Selections, appliances, spec sheets carry through to the installer's tablet. Nothing is re-typed.

07

Operational enforcement

Workflows that block bad states (missing COI, unsigned waiver, unconfirmed delivery) before they cost you.

08

An actual finance layer, underneath

Not "ERP-grade." The real thing. Budget commitments, billing, retainage, backcharges, lien releases, GL. One click fires the entries your finance team needs.

Capability matrix

Why trade contractors keep stitching three of these together.

Each adjacent category does its job well. None of them was built for the contractor running design, install, proof, and money on the same floor plan.

Capability
Buildertrend
ServiceTitan
Procore
Acumatica
Scaftra
Room-centric scope & status
✕
✕
~
✕
✓ First-class
Trade-by-trade work scopes
~
✓
~
✕
✓ First-class
Designer to installer continuity
✕
✕
✕
✕
✓
Proof / CYA chain on every install
✕
~
~
✕
✓
Structured punch with accountability
~
✕
✓
✕
✓
Multi-family unit deployment
✕
✕
~
✕
✓ 2,000+ units
Vendor / sub portal with AP spine
✓
✕
✓
~
✓
Operational enforcement (blocks bad state)
✕
~
~
✕
✓
Real finance layer (GL, AP, AR, retainage)
✕
✕
~
✓
✓
// ✓ first-class · ~ partial / via add-on · ✕ not designed for it. Categorized from public docs Apr 2026.
The unspoken thing

Built with full financial depth, without the pain of managing it.

From the kitchen table to the boardroom, you finally have a platform that doesn't make you feel like you're feeding it. The double-entries, the AP, the retainage, the GL hit: all of it lives underneath. The installer never sees it.

Installer taps
Install Complete
A-103 · Kitchen · Cabinets
9–12 financial entries fire
No accountant typing. No spreadsheet round-trip. No "I'll log it tonight."
// what fires underneath, in order
  1. 01Room Scope Specstatus = Completed
  2. 02Install Task Checklist8 / 8 complete
  3. 03Proof Chainphoto, GPS, signoff hashed
  4. 04Budget Commitment% complete recalculated
  5. 05Billing Submissiondraft assembled with proof
  6. 06Retainage Scheduleheld amount accrued
  7. 07Purchase Invoicequeued on accept
  8. 08GL JournalWIP, cost of revenue posted
  9. 09AR Pay App lineadvanced on tenant SOV
  10. 10Schedule Itemdownstream lanes unblocked
  11. 11Punch Queuefinal-clean task spawned
  12. 12Audit Logactor, time, payload sealed
🧰
Kitchen table
"Install is done. Photos uploaded. Sweet."
›
📐
Jobsite trailer
"Billing draft is ready. Vendor portal updated. Punch is loaded."
›
💼
Back office
"AP queued, retainage accrued, GL posted, no one had to type it."
›
🏛️
Boardroom
"WIP, CPI, SPI, and cash position trued up in real time."
Proof. Not Promises.

What "trade execution" looks like at the seams.

Numbers from production tenants running residential remodel, multi-family build, and commercial fit-out work on Scaftra.

94k
operational records generated from a single 148-unit setup wizard run.
42%
faster install close-out vs the contractor's prior stack (avg, first 90 days).
0
missing-proof billing rejections since enforcement shipped to vendor portal.
∞
trades, modelled natively and growing. Cabinets, countertops, trim, paint, tile, flooring, glass, and whatever you ship next.
The product

One spine, four surfaces: Design, Field, Install, Money.

The same room, the same scope, the same chain of evidence, visible to designer, installer, project manager, and AR/AP, each in their own lens.

01 · Design

Selections that survive the trip to the jobsite.

Appliances, finishes, spec sheets, PDFs, captured in a versioned Design Workspace and locked to the room. When the installer opens the tablet, the same kitchen they're standing in is on the screen.

  • Versioned design rounds with diff (v5 vs v6 · +1 added, -10 removed)
  • Per-room appliance & finish library with PDF cut sheets
  • Submit-for-review flow with structured client sign-off
Design Workspace · versioned design round with appliances per room
02 · Field

Plans, blocking, and readiness on one floor plan.

Field mode shows the rooms, the revisions, and the open issues, overlaid on the drawing the installer is working from. Block a room and the schedule, billing, and punch surfaces all know about it instantly.

  • Sheet revisions with delta callouts (V2 to V3 · 5 areas changed)
  • Blocking issues pinned to rooms, not lost in a comment thread
  • Field-approve or resolve-with-proof from the same canvas
Field mode · Level 1 floor plan with kitchen blocking issue
03 · Install

Every install carries its own chain of proof.

Measure complete, fabrication ordered, install complete, final clean. Each step is a structured task with required photos and timestamps. Missing proof blocks the next step, and the next billing submission.

  • CYA Proof Meter on every install (33% / 66% / 100%)
  • Task checklist with photo evidence per step
  • Scheduler-owned dates, installer-owned proof. No cross-edit chaos
Install detail · GLM Install with task checklist and CYA proof meter
04 · Operations

Multi-family scale without "click Add Room 700 times."

Describe the project once (buildings, sections, unit templates, common areas) and the Structure setup wizard deploys it. 148 units, 704 rooms, 1,852 work scopes, 94,212 operational records. One run. Idempotent and resumable.

  • Templates × sections × counts × numbering, in a flat global table
  • Live totals, pre-flight dry-run, aggregate-cap enforcement
  • LocalStorage drafts. Pick up where you left off after a network blip
Structure setup wizard · Deploy Units step with 148 units across 3 buildings
The name, decoded

Scaftra is built for the contractor whose business doesn't fit any of the boxes, but lives or dies by how well the install actually went.

// etymology
SCAlable  For  TRAdes
SCAlable: 1 project to 2,000 units, one workflow
For: built with, not adapted to
TRAdes: cabinets, tops, trim, tile, paint, flooring, glass
// said out loud
"Scaftra" pronounced /skaf-truh/

// what it is
the operating spine
between designer,
field, and install.

// what it isn't
"all-in-one"
"AI construction platform"
"yet another field app"
Pricing

Priced per project, not per seat. Bring your whole crew.

Every plan includes unlimited users, every trade module, the client portal, and the vendor portal. Pay for the work you're running, not the people doing it.

FOUNDING MEMBER
Founding Member Program

Lock in 25% off your first year.

  • 25% off for 12 months
  • Priority support
  • Early access to new features
  • Direct input into product direction

Limited to the first 50 founding members.

Starter
$99/ month
Includes up to 5 Active Projects
  • Unlimited users
  • All features included
  • All trade modules
  • Client portal
  • Standard support
Growth
$199/ month
Includes up to 15 Active Projects
  • Unlimited users
  • All features included
  • All trade modules
  • Client portal
  • Standard support
Enterprise
Custom
For teams running 30+ Active Projects
  • Everything in Pro
  • API access
  • White-label options
  • SSO / SAML & SCIM
  • Custom onboarding
Billed monthly. Switch to annual and save 15%. 21-day trial. Cancel any time.
Proof. Not Promises.

Move the work, not the spreadsheets.

Bring one project onto Scaftra. We'll set up your trades, your rooms, your CYA chain, and your vendor portal. If you don't ship faster and bill cleaner in 30 days, we'll walk you out.

// what you'll see
01 · room-centric scope & status
02 · designer to installer continuity
03 · the CYA proof meter, live
04 · vendor-side billing & retainage
05 · the multi-family setup wizard

// what we'll ask
one active project · your trades · the headache you can't get rid of