Glass & Mirror Software for Finish-Trade Contractors

Shower glass and mirrors install last, into finished rooms, and they're fragile and expensive, a chip on a finished wall or a wrong finish choice is a remake, not a repair.

Scaftra scopes glass per room, captures the finish and hardware choices as Selections, and proves the finished condition, so the late, delicate install is on the record.

Start free→

The problem

Glass and mirrors go in late, into already-finished rooms, and the install is unforgiving, the surrounding tile and paint are done, so damage during install is damage to finished work. The product choices (finish, hardware, edge) drive a remake if they're wrong.

Why it matters

Glass is the last expensive thing into the room and it's installed against finished surfaces. A scratched wall or a wrong-finish hinge is a high-cost remake and a homeowner dispute. Capturing the choices up front and proving the finished condition is how you avoid both.

Common mistakes

Try
Unconfirmed finish and hardware
Reality
Glass hardware finish and edge are remakes if wrong. A verbal choice is not an approved Selection.
Try
No proof of the finished room
Reality
Install against finished tile and paint, without before/after proof, damage claims are unsettleable.
Try
Scheduling the install too early
Reality
Glass goes into finished rooms. Installing before the room is finished risks the glass and the work around it.

The recommended workflow

  1. Scope glass per room
    Set which rooms get glass or mirror work so it's tracked per room.
  2. Capture the choices
    Record finish, hardware, and edge as Selections the homeowner approves before order.
  3. Schedule the late install
    Schedule the install into finished rooms, after the surrounding trades.
  4. Prove the finished condition
    Capture before/after proof of the room and the install.
  5. Close the room
    Walk the punch and close; progress rolls up to billing.

How Scaftra solves this

Scaftra runs glass and mirror as a room-scoped trade on the same execution spine as every finish trade. Only the rooms that get glass and mirror carry it; scheduling a crew onto the job is what puts them on the project; install progress is captured as photo proof and daily logs room by room; homeowner choices ride Selections that gate the room until approved; and completed work advances the room's install phase, which drives earned value and billing. Because glass installs last into finished space, Selections capture the finish and hardware choices and per-room proof evidences the finished condition.

  • Choices on the record
    Finish, hardware, and edge captured as approved Selections.
  • Finished-room proof
    Before/after proof of the room and the install.
  • Late-stage scheduling
    Install scheduled into finished rooms after surrounding trades.

Key features

  • Per-room trade scoping: Only the rooms that actually get glass and mirror carry it, scope is set per room, not per job.
  • Scheduling that builds the crew: Putting a crew on the schedule is the act that assigns them to the project, no separate roster step.
  • Install proof + daily logs: Photo proof and daily logs evidence the work room by room, the record that settles a dispute.
  • Homeowner sign-off via Selections: Finish and product choices are captured as Selections that block the room until the homeowner approves.
  • Progress drives billing: Completed install advances the room's phase, which the financial spine reads for earned value and billing.

On the roadmapComing soon

  • Glass templating & order tracking: Measure-to-fabrication tracking for shower glass and mirrors, like the cabinet and countertop lifecycle.

Benefits

  • Every room that gets glass and mirror is scoped, scheduled, and tracked, no whole-house guesswork.
  • Photo proof and daily logs make the work defensible when a dispute lands.
  • Homeowner choices are approved up front, so remakes don't trace to a verbal yes.
  • Completed work rolls up to earned value and billing automatically.

Who this is for

1–3 installer shops4–10 crew shops11+ crew operations
  • 1–3 installer shops.Owner-run glass and mirror crews who need per-room scope and proof without a back office.
  • 4–10 crew shops.Growing glass and mirror contractors where per-room tracking prevents missed work and slipped dates.
  • 11+ crew operations.High-volume glass and mirror operations needing room-level visibility across many jobs at once.

Frequently asked questions

Does Scaftra template or fabricate glass?
No. Glass rides the general surfaces: per-room scope, Selections for the choices, scheduling, and proof. The field-measure-then-fabricate workflow is specific to cabinets and countertops; Scaftra does not model it for glass.
How are finish and hardware choices handled?
They're captured as Selections the homeowner approves, so a wrong-finish remake doesn't trace back to a verbal choice.
How does it protect against damage claims?
Glass installs against finished surfaces, before/after photo proof evidences the room's condition so damage disputes are settleable.
When does glass get scheduled?
Late, into finished rooms, scheduling places the install after the surrounding trades are done.
Is this only for glass?
Scaftra covers all finish trades: cabinets, countertops, trim, paint, tile, flooring, glass, doors and hardware, closets.

One job. One record. From the field to the books.

Bring one project onto Scaftra. We'll set up your trades, your rooms, your proof chain, and your vendor portal, and connect it to the financial system you already run.