NEW 21-day free trial · onboard your first project in a day · cancel anytime Start free

Door & Hardware Software for Finish Contractors

Doors and hardware is a per-opening, schedule-heavy trade installed late and judged on details: handing, alignment, latch, finish, so it's the trade the punch list lives on.

Scaftra scopes doors and hardware per room, schedules the late install, and proves alignment and finish per opening, so the punch-prone trade is on the record instead of in a text thread.

Start free→

The problem

Doors and hardware is per-opening work: each door has a hand, a hardware set, and a finish, installed late in the job and judged on alignment and operation. It's punch-prone by nature: a latch that doesn't catch or a finish that doesn't match is a callback. When the openings and their punch state aren't tracked, the list lives in someone's head.

Why it matters

Doors are operated every day and the homeowner notices every misaligned latch. The trade is detail-heavy and late, so its punch list is long and its disputes are about whether an opening was finished right. Per-room install records and punch proof are where that's settled.

Common mistakes

Try
No per-opening tracking
Reality
Hand, hardware set, and finish are per-opening details. A job-level status can't say which openings are hung, set, and adjusted.
Try
Punch list in someone's head
Reality
Doors are the punch-heavy trade. An untracked list means openings get missed at closeout.
Try
No proof of finish and alignment
Reality
Latch and finish disputes need a record. No photo means a verbal argument at walkthrough.

The recommended workflow

  1. Scope doors per room
    Set which rooms and openings get door and hardware work so it's tracked where it happens.
  2. Capture the choices
    Record hardware set and finish as Selections the homeowner approves.
  3. Schedule the late install
    Schedule the install for the late finish window.
  4. Hang, set, and proof
    Evidence each opening's alignment, latch, and finish with photo proof.
  5. Walk the punch and close
    Track and clear the per-opening punch; progress rolls up to billing.

How Scaftra solves this

Scaftra runs door and hardware as a room-scoped trade on the same execution spine as every finish trade. Only the rooms that get door and hardware carry it; scheduling a crew onto the job is what puts them on the project; install progress is captured as photo proof and daily logs room by room; homeowner choices ride Selections that gate the room until approved; and completed work advances the room's install phase, which drives earned value and billing. Because doors and hardware is per-opening and punch-prone, the per-room install record and punch proof track each opening's finished state.

  • Per-opening tracking
    Hand, hardware set, and finish tracked per opening and room.
  • Punch proof
    Photo proof of alignment, latch, and finish per opening.
  • Choices as Selections
    Hardware set and finish captured as approved choices.

Key features

  • Per-room trade scoping: Only the rooms that actually get door and hardware carry it, scope is set per room, not per job.
  • Scheduling that builds the crew: Putting a crew on the schedule is the act that assigns them to the project, no separate roster step.
  • Install proof + daily logs: Photo proof and daily logs evidence the work room by room, the record that settles a dispute.
  • Homeowner sign-off via Selections: Finish and product choices are captured as Selections that block the room until the homeowner approves.
  • Progress drives billing: Completed install advances the room's phase, which the financial spine reads for earned value and billing.

On the roadmapComing soon

  • Door & hardware schedule: A per-opening door schedule with handing and hardware sets.

Benefits

  • Every room that gets door and hardware is scoped, scheduled, and tracked, no whole-house guesswork.
  • Photo proof and daily logs make the work defensible when a dispute lands.
  • Homeowner choices are approved up front, so remakes don't trace to a verbal yes.
  • Completed work rolls up to earned value and billing automatically.

Who this is for

1–3 installer shops4–10 crew shops11+ crew operations
  • 1–3 installer shops.Owner-run door and hardware crews who need per-room scope and proof without a back office.
  • 4–10 crew shops.Growing door and hardware contractors where per-room tracking prevents missed work and slipped dates.
  • 11+ crew operations.High-volume door and hardware operations needing room-level visibility across many jobs at once.

Frequently asked questions

Does Scaftra track doors per opening?
Doors and hardware is scoped per room and the per-room install record plus punch proof track each opening's finished state.
How are hardware and finish choices handled?
They're captured as Selections the homeowner approves, so a wrong-finish or wrong-set dispute doesn't trace to a verbal choice.
Is there a door-ordering workflow to the shop?
No: doors and hardware ride the general surfaces (scope, Selections, schedule, proof, billing). Ordering against an as-built measure is specific to cabinets and countertops.
How does it help with the punch list?
The per-opening punch is tracked and evidenced with proof, so latch and finish items don't get missed at closeout.
Is this only for doors?
Scaftra covers all finish trades: cabinets, countertops, trim, paint, tile, flooring, glass, doors and hardware, closets.

One job. One record. From the field to the books.

Bring one project onto Scaftra. We'll set up your trades, your rooms, your proof chain, and your vendor portal, and connect it to the financial system you already run.